How much concrete for a 3×3 m slab at 125 mm thick?

You'll need about 1.18 m³ of concrete for this slab, including a 5% wastage allowance — that's roughly 110 × 20 kg premix bags if you're not ordering pre-mixed.

At this volume, bagged premix is a practical DIY option — budget real time for mixing this many bags by hand.

Worked calculation
Slab size3 m × 3 m
Thickness125 mm
Waste allowance5%
Concrete volume1.18 m³
20 kg bags110
Approx. mass2.84 t (@ 2.4 t/m³)

Assumptions

Check before you order: Confirm reinforcement (mesh/reo), site access for a mixer truck, and the exact thickness with your slab supplier or engineer before ordering — this figure is volume only.

How this is worked out & FAQ

How this is worked out

  1. Multiply length × width × thickness (in metres) for raw volume.
  2. Add the waste allowance.
  3. Divide by 0.0108 m³ per 20 kg bag and round up, if using bags.

FAQ

Should I order bags or a truck?

At this volume, bagged premix is usually practical, though it's worth a quick delivered quote for comparison if you're short on time.

Does this include reinforcement mesh?

No — this is concrete volume only. Use the Reo mesh calculator on /site/materials for SL-mesh sheet counts separately.

What about edge thickening or footings?

Not included — this assumes a uniform slab thickness. Add extra volume separately for any thickened edges or integrated footings.